List of Figures

 

 


Chapter 1

Introduction

Figure 1.1

Location of Project Site

Figure 1.2

Predicted Extent of Flood Events

 

 

Chapter 2

Options Selection

Figure 2.1

River Alignment and Land Requirement of Option A and Option B

 

 

Chapter 3

Project Description

Figure 3.1

River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (1/5)

Figure 3.2

River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (2/5)

Figure 3.3

River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (3/5)

Figure 3.4

River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (4/5)

Figure 3.5

River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (5/5)

Figure 3.6

Construction Work Areas

Figure 3.7

Typical Cross Section of the River Design – Trapezoid Channel

Figure 3.8

Typical Cross Section of the River Design – Compound Channel

Figure 3.9

Typical Cross Section of the River Design – Vertical Sidewall

Figure 3.10

Typical Drawings of Boundary Fence (1/2)

Figure 3.11

Typical Drawings of Boundary Fence (2/2)

Figure 3.12

Dry Weather Flow Interception at Shenzhen

Figure 3.13

Construction Sequence and Typical Cross Section of Cofferdam during Construction

Figure 3.14

Locations of Stockpiling Areas (1/4) and Site Offices

Figure 3.15

Locations of Stockpiling Areas (2/4) and Site Offices

Figure 3.16

Locations of Stockpiling Areas (3/4) and Site Offices

Figure 3.17

Locations of Stockpiling Areas (4/4) and Site Offices

Figure 3.18

Location of Concurrent Projects

Figure 3.19

Construction Programme

 

 

Chapter 4

Air Quality Impact Assessment

Figure 4.1

Potential Air Sensitive Receivers and Work Areas

Figure 4.2

AVS Sampling Location Plan

Figure 4.3

Unmitigated Maximum Hourly TSP Concentration at 1.5m above ground (Scenario 1 – Active Works Areas Shift to South)

Figure 4.4

Unmitigated Maximum Daily TSP Concentration at 1.5m above ground (Scenario 1 – Active Works Areas Shift to South)

Figure 4.5

Unmitigated Maximum Hourly TSP Concentration at 1.5m above ground (Scenario 2 – Active Works Areas Shift to North)

Figure 4.6

Unmitigated Maximum Daily TSP Concentration at 1.5m above ground     (Scenario 2 – Active Works Areas Shift to North)

Figure 4.7

Unmitigated Annual Average TSP Concentration at 1.5m above ground

Figure 4.8

Maximum Hourly TSP Concentration at 1.5m above ground (Scenario 1 – Active Works Areas Shift to South)

Figure 4.9

Maximum Daily TSP Concentration at 1.5m above ground (Scenario 1 – Active Works Areas Shift to South)

Figure 4.10

Mitigated Maximum Hourly TSP Concentration at 1.5m above ground      (Scenario 2 – Active Works Areas Shift to North)

Figure 4.11

Mitigated Maximum Daily TSP Concentration at 1.5m above ground (Scenario 2 – Active Works Areas Shift to North)

Figure 4.12

Annual Average TSP Concentration at 1.5m above ground

Figure 4.13

Locations of Construction Dust Monitoring Stations

 

 

Chapter 5

Noise

Figure 5.1

Prevailing Background Noise Measurement Location

Figure 5.2

Location of Representative Noise Sensitive Receivers

 

 

Chapter 6

Water Quality

Figure 6.1

Project Site and Study Area

Figure 6.2

Locations of Monitoring Stations for Routine River Water Quality Monitoring Conducted by Shenzhen Environmental Monitoring Centre and HK EPD

Figure 6.3

Locations of Monitoring Stations for the Baseline River Water Quality Monitoring survey Conducted in the Wet and Dry Seasons, 2009

Figure 6.4

Locations of Tributaries / Outfall Monitoring Stations along Shenzhen River

Figure 6.5

Locations of Sampling Stations for the Sediment Quality Sampling Programme

Figure 6.6

Locations of Water Quality Sensitive Receivers (WSRs)

 

 

Chapter 7

Terrestrial Ecological Assessment

Figure 7.1

Study Area

Figure 7.2

Sites of Conservation Importance Downstream of Study Area along Shenzhen River

Figure 7.3

Location of Survey Transect and Sampling Points

Figure 7.4a

Habitat Map (Sheet 1 of 3)

Figure 7.4b

Habitat Map (Sheet 2 of 3)

Figure 7.4c

Habitat Map (Sheet 3 of 3)

Figure 7.5

Photographic Records of Various Habitats Identified in the Hong Kong Section of the Study Area

Figure 7.6

Photographic Records of Various Habitats Identified in the Hong Kong Section of the Study Area

Figure 7.7

Photographic Records of Various Habitats Identified in the Hong Kong Section of the Study Area

Figure 7.8

Species of Conservation Interest

Figure 7.9

Proposed Compensatory Tree Planting Location

Figure 7.10

Location of Riverbank Landscaping Areas and Floodplain Areas (to mitigate the loss of Marshy Low-lying Grassland)

Figure 7.11

Indicative Cross Section of Riverbank Landscaping Areas and Flood Plain Areas

 

 

Chapter 8

Fisheries Impact Assessment

Figure 8.1

Location of Active and Abandoned Ponds within the Study Area

Figure 8.2

Location of Project Area, Fish Culture Zones, Fish Ponds and Oyster Production Areas in Hong Kong

 

 

Chapter 9

Waste Management Assessment

Figure 9.1

Management Framework for Dredged/Excavated Sediment (in the text)

Figure 9.2

Sediment Sampling Location Plan

 

 

Chapter 10

Land Contamination Assessment

Figure 10.1

Commercial and Industrial Developments in Vicinity of the Project Area

Figure 10.2

Soil Sampling Location

 

 

Chapter 11

Cultural Heritage

Figure 11.1

Project Site and the CHIA Study Area

Figure 11.2

Key Plan Showing the Identified Built Heritage Features within the CHIA Study Area

Figure 11.3

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 1 of 9)

Figure 11.4

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 2 of 9)

Figure 11.5

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 3 of 9)

Figure 11.6

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 4 of 9)

Figure 11.7

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 5 of 9)

Figure 11.8

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 6 of 9)

Figure 11.9

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 7 of 9)

Figure11.10

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 8 of 9)

Figure 11.11

1:1000 Location Plan of the Identified Built Heritage Features (Sheet 9 of 9)

Figure 11.12

Sections for Archaeological Potential Evaluation

Figure 11.13

Locations of Test Pits and Auger Holes

Figure 11.14

Geological Map of the CHIA Study Area

Figure 11.15

Layout Plan for Test Pits and Auger Holes Location and Topography of Pak Fu Shan Section

Figure 11.16

Layout Plan for Test Pits and Auger Holes Location and Topography of Pak Fu Shan Section

Figure 11.17

Geology of Pak Fu Shan Section

Figure 11.18

Layout Plan for Test Pits and Auger Holes Location and Topography of Chuk Yuen Section

Figure 11.19

Geology of Chuk Yuen Section

Figure 11.20

Vegetation Clearance to Gain Access to the Trial Pits and Auger Holes (in the text)

Figure 11.21

Spiked Fence Blocked Further Access towards South of AH19 (in the text)

Figure 11.22

Grey Pottery Shard (NPFS2010: SF 1) (Left: Dorsal; Right: Ventral) (in the text)

Figure 11.23

Pottery Shard (NCY2010: SF 2) Photograph (Left) and Drawing (Right) (in the text)

Figure 11.24

Painted Pottery Shard (NCY2010: SF 1) (Left: Dorsal; Right: Ventral) (in the text)

Figure 11.25

Rim Shard (NCY2010: SF 3) Photograph (Upper) and Drawing (Lower) (in the text)

Figure 11.26

Selected Brown and Dark Brown Glazed Porcelain Recovered from Stratum 4 of TP2 (Upper); Selected Blue-and-white Porcelains, White Porcelain and Celadon Recovered from Stratum 4 of TP3 (Lower) (in the text)

 

 

Chapter 12

Landscape and Visual Impact Assessment

Figure 12.0

Draft Development Permission Area Plans

Figure 12.1

Existing Landscape Character Area

Figure 12.2

Landscape Character Area Impacts

Figure 12.3

Settled Agricultural Lowland Landscape (in the text)

Figure 12.4

Natural Vegetated Hillside Landscape (in the text)

Figure 12.5

Channelized Watercourse Landscape (in the text)

Figure 12.6

Natural River and Floodplain Landscape (in the text)

Figure 12.7a

Existing Landscape Resources (Sheet 1 of 3)

Figure 12.7b

Existing Landscape Resources (Sheet 2 of 3)

Figure 12.7c

Existing Landscape Resources (Sheet 3 of 3)

Figure 12.8a

Landscape Resources Impacts (Sheet 1 of 3)

Figure 12.8b

Landscape Resources Impacts (Sheet 2 of 3)

Figure 12.8c

Landscape Resources Impacts (Sheet 3 of 3)

Figure 12.9

Channelized Watercourse (in the text)

Figure 12.10

Natural Watercourse (in the text)

Figure 12.11

Pond (in the text)

Figure 12.12

Woodland on Hillside (in the text)

Figure 12.13

Woodland on Lowland (in the text)

Figure 12.14

Fung Shui Forest (in the text)

Figure 12.15

Shrubby Grassland on Hillside (in the text)

Figure 12.16

Shrubby Grassland on Lowland (in the text)

Figure 12.17

Active Farmland (in the text)

Figure 12.18

Inactive Farmland

Figure 12.19

Commercial Farm (in the text)

Figure 12.20

Village Area (in the text)

Figure 12.21

Traditional Village Area (in the text)

Figure 12.22

Abandoned Village Area (in the text)

Figure 12.23

Temple (in the text)

Figure 12.24

Rural Built/Open Storage Area (in the text)

Figure 12.25

Ongoing Development (in the text)

Figure 12.26

Road (in the text)

Figure 12.27

Landscape and Visual Mitigation Plan

Figure 12.28

Initial Visual Envelope based on GIS Software

Figure 12.29

Locations of Visually Sensitive Receivers and Vantage Points

Figure 12.30a

VP1 Photomontage View from Ta Kwu Ling Village (Sheet 1 of 2)

Figure 12.30b

VP1 Photomontage View from Ta Kwu Ling Village (Sheet 2 of 2)

Figure 12.31a

VP2 Photomontage View from Kaw Liu Village (Sheet 1 of 2)

Figure 12.31b

VP2 Photomontage View from Kaw Liu Village (Sheet 2 of 2)

Figure 12.32a

VP3 Photomontage View from Lin Ma Hang Road (Sheet 1 of 2)

Figure 12.32b

VP3 Photomontage View from Lin Ma Hang Road (Sheet 2 of 2)

Figure 12.33

Landscape Master Plan

 

 

Chapter 13

Environmental Monitoring and Audit Measures

Figure 13.1

Location of Construction Dust and Noise Monitoring Stations