List of Figures
Chapter 1
Introduction
Figure 1.1
Location of Project Site
Figure 1.2
Predicted Extent of Flood Events
Chapter 2
Options Selection
Figure 2.1
River Alignment and Land Requirement of Option A and Option B
Chapter 3
Project Description
Figure 3.1
River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (1/5)
Figure 3.2
River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (2/5)
Figure 3.3
River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (3/5)
Figure 3.4
River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (4/5)
Figure 3.5
River Modification and Reprovision of Boundary Patrol Road and Boundary Fence (5/5)
Figure 3.6
Construction Work Areas
Figure 3.7
Typical Cross Section of the River Design – Trapezoid Channel
Figure 3.8
Typical Cross Section of the River Design – Compound Channel
Figure 3.9
Typical Cross Section of the River Design – Vertical Sidewall
Figure 3.10
Typical Drawings of Boundary Fence (1/2)
Figure 3.11
Typical Drawings of Boundary Fence (2/2)
Figure 3.12
Dry Weather Flow Interception at Shenzhen
Figure 3.13
Construction Sequence and Typical Cross Section of Cofferdam during Construction
Figure 3.14
Locations of Stockpiling Areas (1/4) and Site Offices
Figure 3.15
Locations of Stockpiling Areas (2/4) and Site Offices
Figure 3.16
Locations of Stockpiling Areas (3/4) and Site Offices
Figure 3.17
Locations of Stockpiling Areas (4/4) and Site Offices
Figure 3.18
Location of Concurrent Projects
Figure 3.19
Construction Programme
Chapter 4
Air Quality Impact Assessment
Figure 4.1
Potential Air Sensitive Receivers and Work Areas
Figure 4.2
AVS Sampling Location Plan
Figure 4.3
Unmitigated Maximum Hourly TSP Concentration at 1.5m above ground (Scenario 1 – Active Works Areas Shift to South)
Figure 4.4
Unmitigated Maximum Daily TSP Concentration at 1.5m above ground (Scenario 1 – Active Works Areas Shift to South)
Figure 4.5
Unmitigated Maximum Hourly TSP Concentration at 1.5m above ground (Scenario 2 – Active Works Areas Shift to North)
Figure 4.6
Unmitigated Maximum Daily TSP Concentration at 1.5m above ground (Scenario 2 – Active Works Areas Shift to North)
Figure 4.7
Unmitigated Annual Average TSP Concentration at 1.5m above ground
Figure 4.8
Maximum Hourly TSP Concentration at 1.5m above ground (Scenario 1 – Active Works Areas Shift to South)
Figure 4.9
Maximum Daily TSP Concentration at 1.5m above ground (Scenario 1 – Active Works Areas Shift to South)
Figure 4.10
Mitigated Maximum Hourly TSP Concentration at 1.5m above ground (Scenario 2 – Active Works Areas Shift to North)
Figure 4.11
Mitigated Maximum Daily TSP Concentration at 1.5m above ground (Scenario 2 – Active Works Areas Shift to North)
Figure 4.12
Annual Average TSP Concentration at 1.5m above ground
Figure 4.13
Locations of Construction Dust Monitoring Stations
Chapter 5
Noise
Figure 5.1
Prevailing Background Noise Measurement Location
Figure 5.2
Location of Representative Noise Sensitive Receivers
Chapter 6
Water Quality
Figure 6.1
Project Site and Study Area
Figure 6.2
Locations of Monitoring Stations for Routine River Water Quality Monitoring Conducted by Shenzhen Environmental Monitoring Centre and HK EPD
Figure 6.3
Locations of Monitoring Stations for the Baseline River Water Quality Monitoring survey Conducted in the Wet and Dry Seasons, 2009
Figure 6.4
Locations of Tributaries / Outfall Monitoring Stations along Shenzhen River
Figure 6.5
Locations of Sampling Stations for the Sediment Quality Sampling Programme
Figure 6.6
Locations of Water Quality Sensitive Receivers (WSRs)
Chapter 7
Terrestrial Ecological Assessment
Figure 7.1
Study Area
Figure 7.2
Sites of Conservation Importance Downstream of Study Area along Shenzhen River
Figure 7.3
Location of Survey Transect and Sampling Points
Figure 7.4a
Habitat Map (Sheet 1 of 3)
Figure 7.4b
Habitat Map (Sheet 2 of 3)
Figure 7.4c
Habitat Map (Sheet 3 of 3)
Figure 7.5
Photographic Records of Various Habitats Identified in the Hong Kong Section of the Study Area
Figure 7.6
Figure 7.7
Figure 7.8
Species of Conservation Interest
Figure 7.9
Proposed Compensatory Tree Planting Location
Figure 7.10
Location of Riverbank Landscaping Areas and Floodplain Areas (to mitigate the loss of Marshy Low-lying Grassland)
Figure 7.11
Indicative Cross Section of Riverbank Landscaping Areas and Flood Plain Areas
Chapter 8
Fisheries Impact Assessment
Figure 8.1
Location of Active and Abandoned Ponds within the Study Area
Figure 8.2
Location of Project Area, Fish Culture Zones, Fish Ponds and Oyster Production Areas in Hong Kong
Chapter 9
Waste Management Assessment
Figure 9.1
Management Framework for Dredged/Excavated Sediment (in the text)
Figure 9.2
Sediment Sampling Location Plan
Chapter 10
Land Contamination Assessment
Figure 10.1
Commercial and Industrial Developments in Vicinity of the Project Area
Figure 10.2
Soil Sampling Location
Chapter 11
Cultural Heritage
Figure 11.1
Project Site and the CHIA Study Area
Figure 11.2
Key Plan Showing the Identified Built Heritage Features within the CHIA Study Area
Figure 11.3
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 1 of 9)
Figure 11.4
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 2 of 9)
Figure 11.5
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 3 of 9)
Figure 11.6
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 4 of 9)
Figure 11.7
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 5 of 9)
Figure 11.8
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 6 of 9)
Figure 11.9
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 7 of 9)
Figure11.10
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 8 of 9)
Figure 11.11
1:1000 Location Plan of the Identified Built Heritage Features (Sheet 9 of 9)
Figure 11.12
Sections for Archaeological Potential Evaluation
Figure 11.13
Locations of Test Pits and Auger Holes
Figure 11.14
Geological Map of the CHIA Study Area
Figure 11.15
Layout Plan for Test Pits and Auger Holes Location and Topography of Pak Fu Shan Section
Figure 11.16
Figure 11.17
Geology of Pak Fu Shan Section
Figure 11.18
Layout Plan for Test Pits and Auger Holes Location and Topography of Chuk Yuen Section
Figure 11.19
Geology of Chuk Yuen Section
Figure 11.20
Vegetation Clearance to Gain Access to the Trial Pits and Auger Holes (in the text)
Figure 11.21
Spiked Fence Blocked Further Access towards South of AH19 (in the text)
Figure 11.22
Grey Pottery Shard (NPFS2010: SF 1) (Left: Dorsal; Right: Ventral) (in the text)
Figure 11.23
Pottery Shard (NCY2010: SF 2) Photograph (Left) and Drawing (Right) (in the text)
Figure 11.24
Painted Pottery Shard (NCY2010: SF 1) (Left: Dorsal; Right: Ventral) (in the text)
Figure 11.25
Rim Shard (NCY2010: SF 3) Photograph (Upper) and Drawing (Lower) (in the text)
Figure 11.26
Selected Brown and Dark Brown Glazed Porcelain Recovered from Stratum 4 of TP2 (Upper); Selected Blue-and-white Porcelains, White Porcelain and Celadon Recovered from Stratum 4 of TP3 (Lower) (in the text)
Chapter 12
Landscape and Visual Impact Assessment
Figure 12.0
Draft Development Permission Area Plans
Figure 12.1
Existing Landscape Character Area
Figure 12.2
Landscape Character Area Impacts
Figure 12.3
Settled Agricultural Lowland Landscape (in the text)
Figure 12.4
Natural Vegetated Hillside Landscape (in the text)
Figure 12.5
Channelized Watercourse Landscape (in the text)
Figure 12.6
Natural River and Floodplain Landscape (in the text)
Figure 12.7a
Existing Landscape Resources (Sheet 1 of 3)
Figure 12.7b
Existing Landscape Resources (Sheet 2 of 3)
Figure 12.7c
Existing Landscape Resources (Sheet 3 of 3)
Figure 12.8a
Landscape Resources Impacts (Sheet 1 of 3)
Figure 12.8b
Landscape Resources Impacts (Sheet 2 of 3)
Figure 12.8c
Landscape Resources Impacts (Sheet 3 of 3)
Figure 12.9
Channelized Watercourse (in the text)
Figure 12.10
Natural Watercourse (in the text)
Figure 12.11
Pond (in the text)
Figure 12.12
Woodland on Hillside (in the text)
Figure 12.13
Woodland on Lowland (in the text)
Figure 12.14
Fung Shui Forest (in the text)
Figure 12.15
Shrubby Grassland on Hillside (in the text)
Figure 12.16
Shrubby Grassland on Lowland (in the text)
Figure 12.17
Active Farmland (in the text)
Figure 12.18
Inactive Farmland
Figure 12.19
Commercial Farm (in the text)
Figure 12.20
Village Area (in the text)
Figure 12.21
Traditional Village Area (in the text)
Figure 12.22
Abandoned Village Area (in the text)
Figure 12.23
Temple (in the text)
Figure 12.24
Rural Built/Open Storage Area (in the text)
Figure 12.25
Ongoing Development (in the text)
Figure 12.26
Road (in the text)
Figure 12.27
Landscape and Visual Mitigation Plan
Figure 12.28
Initial Visual Envelope based on GIS Software
Figure 12.29
Locations of Visually Sensitive Receivers and Vantage Points
Figure 12.30a
VP1 Photomontage View from Ta Kwu Ling Village (Sheet 1 of 2)
Figure 12.30b
VP1 Photomontage View from Ta Kwu Ling Village (Sheet 2 of 2)
Figure 12.31a
VP2 Photomontage View from Kaw Liu Village (Sheet 1 of 2)
Figure 12.31b
VP2 Photomontage View from Kaw Liu Village (Sheet 2 of 2)
Figure 12.32a
VP3 Photomontage View from Lin Ma Hang Road (Sheet 1 of 2)
Figure 12.32b
VP3 Photomontage View from Lin Ma Hang Road (Sheet 2 of 2)
Figure 12.33
Landscape Master Plan
Chapter 13
Environmental Monitoring and Audit Measures
Figure 13.1
Location of Construction Dust and Noise Monitoring Stations